The last fee weeks have seen dramatic changes in the site. The third floor residential wing now has the ceiling/roof concrete planks installed. Planks were installed yesterday to form the floor of the reading room. The large square masonry wall you see to the right is the core of the east wall of the chapel.
A stone shooter (below) was used to spread stone on the north end of the building in preparation for pouring the concrete slab.
In the residence wing, the corridor on the first floor is taking shape as the studding for the room and corridor walls goes up.
More pictures from yesterday and today can be seen at Construction17Sept .
Saturday, September 18, 2010
Sunday, August 22, 2010
Concrete plank installation.
Here is video of installation of concrete planks which form the ceiling of the second floor and base of third floor residential wing. Pretty cool!
Sunday, July 4, 2010
Fourth of July!!
I have been away for a week in California for the Superiors Colloquium at Santa Clara University, with 60 other relatively new superiors. Since mid-June the building is clearly taking shape. The basement of the residential wing is now topped with it's ceiling, which of course is the floor of the first floor. Footings for the rest of the building, which does not have a basement, are being poured so that we can begin to see the shape of what the whole residence will look like.
Thursday, June 17, 2010
Residential wing is taking shape..
We are coming above ground nicely. The plywood framing you see at the top of the wall is for the grouting which will be poured when the cement planks for the first floor are lifted into place. More pictures from today are posted at:
Our Picasa site
Here you can also see prior pictures.
Our Picasa site
Here you can also see prior pictures.
Sunday, May 23, 2010
Its MAY and there is PROGRESS
After a very snowy and wet winter and early spring, we are finally making great strides. Recent pics are available at our Picasa site: http://picasaweb.google.com/colombierecommunity
Saturday, March 20, 2010
FINALLY!!! some action!
After seven weeks of inactivity because of bad weather, we are finally getting important grading done in preparation for laying the foundation of the Residence. The white area is stone dust which has been imported to build up the pad for the foundation. Other pictures, including some of the western work for water control can be seen at http://picasaweb.google.com/colombierecommunity/Grading570420March#
Thursday, January 28, 2010
Digging Deeper
Work continues on chomping away at the hill behind our current residence for the new building and for the water management project at the west (and lower) end of the property. More pictures here.